• Blockwork below DPC completed – plots 19-26
  • Blockwork on plots 27-30 has been started (flats)
  • Manholes in the road being installed
  • Internal drainage plots 19-26 being completed
  • Main drainage run in and being brought up to level
  • Plots 15-18 foundations concreted